Took the Stage 1 and it made light work of dragging tress out of the 8 ft ditch to be cut up.
Sunday, 1 February 2009
Sunday, 25 January 2009
Mats!
Tuesday, 20 January 2009
Door Locks
Easy fit last night of a lock on the rear door. Large parcel from LR
Series arrived and this was the smallest bit!
Series arrived and this was the smallest bit!
Sunday, 18 January 2009
Wires...
Had a look at the Choke light - gave up. Took another look at the interior lighting. Gave up there too.
There's some oddities going on behind the dash and evidence of previous repairs as well as a relay that looks wrong. Need to study the wiring diagram.
Sound proofing
Measured up the Dynamat and it looks as if it will fit well over the rear arches. Will look at it a bit more next week. The Thick rubber mat has not arrived yet.
Brakes, Diffs and Swivel joints.
Checked the brakes and adjusted them today. Found a slight weep on the OSR halfshaft so need to keep an eye on that (will look at the exploded diagram later). Will need to replace the shoes too when I sort it properly.
Braking much improved too with less pedal travel. No problems found thankfully with the cylinders.
Checked the levels in both diffs as well and found that finger tight Fred had been involved with the front prop. One bold finger tight, one about to drop out! So those have been sorted too.
Checked OSF swivel joint and gave up on the other side when the plug refused to move. Will douse with WD40 a few times over the next week and then try again.
Subscribe to:
Posts (Atom)